top of page

Fernando Rivera Intermediate Track & Field

New DG Track, Natural Turf Field, Planting and Irrigation
DJI_20240409094248_0107_D.JPG
DJI_20231009110130_0055_D.JPG

Completed while employed at Weston Miles Architects

Role: Lead Designer and Project Manager through Construction

Location:  Daly City, CA

Year:  Completed in 2024

Budget: $1,000,000

The Track and Field Improvement project at Fernando Rivera Intermediate School revitalized a deteriorated athletic field to better support physical education and student recreation. The existing field suffered from uneven grading, poor drainage, and extensive gopher damage, resulting in typically unusable conditions.

​

The school’s goal was to create a simple, durable, and cost-effective field that would meet daily physical education needs and accommodate informal student sports. The project scope included:

​

  • New Natural Turf Field: Installation of new sod over properly regraded subgrade to provide a safe, level playing surface suitable for soccer and general recreation.

  • Irrigation System: Implementation of a new irrigation system to support healthy turf growth and long-term field maintenance.

  • Decomposed Granite (DG) Track: Construction of a low-maintenance DG track surrounding the field to accommodate running, walking, and PE activities.

  • Landscape Enhancements: New planting along the street frontage to improve the school’s curb appeal.

408-963-3410

3720B Main Street

Kelseyville, CA 95451

  • Facebook
  • Instagram

All images on this website are copyrighted and may not be used without the express permission of the owner. 

bottom of page